| Availability: | |
|---|---|
XH-SCT-T16 100A/333mV
Jiangyin Spark
100A/333mV Split Core Current Transformer
The XH-SCT-T16 is a compact 100A/333mV split core current transformer designed for energy meters, submetering systems and power monitoring equipment.
Its 333mV voltage output is suitable for direct connection to compatible metering and monitoring inputs. The hinged split-core structure allows quick installation around an existing conductor without disconnecting the primary cable.
Key Features
Rated input current: 100A AC
Rated output: 333mV
Inner window size: 16mm
Accuracy: ≤1%
Standard low-voltage output for compatible energy meters
Compact hinged split-core design
Quick installation around existing conductors
Low phase-angle error
Flame-retardant UL94 V-0 housing
Standard 1m UL1015 twisted-pair leads
Custom ratios, outputs, lead lengths and connectors available
Electrical Specifications
| Parameter | Specification |
|---|---|
| Model | XH-SCT-T16 |
| Rated input current | 100A AC |
| Rated output | 333mV |
| Inner window | 16mm |
| Frequency | 50/60Hz |
| Accuracy | ≤1% from 20% to 120% of rated current |
| Rated insulation voltage | 600V |
| Dielectric withstand voltage | 2.5kV AC for 1 minute |
| Insulation resistance | ≥100MΩ at 500V DC |
| Phase angle | Less than 2° at 50% of rated current |
Mechanical Specifications
| Parameter | Specification |
|---|---|
| Housing material | PA, UL94 V-0 |
| Core material | Ferrite Core |
| Structure | Hinged split core |
| Operating temperature | -25°C to +75°C |
| Operating humidity | ≤85% RH |
| Output connection | UL1015 20AWG twisted-pair wire |
| Standard lead length | 1m |
Typical Applications
Energy meters and power meters
Building energy submetering
Energy management systems
Industrial power monitoring
Solar and renewable energy systems
Smart building monitoring
OEM metering and control equipment
Retrofit current measurement projects
Easy Retrofit Installation
The split-core design allows the transformer to be installed around an existing conductor without disconnecting the primary cable. This helps reduce installation time in new and retrofit energy monitoring projects.
